Auditing Business Safety Inspectors

How to cite

Barron, Manuel; Goicoechea, Ana; Bedoya, Guadalupe; Gertler, Paul; Montufar, Diego Garcia. 2022. "Auditing Business Safety Inspectors." AEA RCT Registry. AEARCTR-0009125. https://doi.org/10.1257/rct.9125-1.0

Download: BibTeX · RIS — for reference managers without a browser translator. Zotero and most others pick up this page's citation metadata directly.

Manuel Barron* , Ana Goicoechea , Guadalupe Bedoya , Paul Gertler , Diego Garcia Montufar

* Primary investigator

Registry ID
AEARCTR-0009125
DOI
https://doi.org/10.1257/rct.9125-1.0
First registered
Last updated
Status
On going
Trial dates
2021-07-01 – 2022-12-31
Countries
Peru (Lima)
JEL codes
O12
Registry record
http://www.socialscienceregistry.org/trials/9125

Abstract

In collaboration with the Ministry of Housing and up to five municipalities in Peru, we will conduct an experiment to evaluate whether variations in the implementation of the building safety-regulation can improve state's capacity and safety and reduce leakages. Most firms require multiple visits to obtain the safety certificate and start operations, creating inefficiencies and opportunities for rent-seeking. Constraints identified in this system include high discretion in the application of the regulation and low capacity to enforce the regulation by municipalities in charge of the implementation. We are rolling out an electronic inspection system and will assess the impact of increasing inspector accountability through random audits.

Intervention

Business safety inspections in Peru are conducted by municipal inspectors who have little or no oversight. Together with a vague regulation, this creates room for rent-seeking and gives inspectors little incentives to exert effort. In collaboration with up to three municipalities in Lima, we are setting up an auditing system where a highly trained third-party auditor visits recently inspected firms and double-checks a random subset of inspection items. One treatment arm has a high audit rate (~70%) and the other a low audit rate (~20%).

Experimental design

Inspectors are randomly assigned to High or Low audit intensity arms, which will determine if 70 or 20% of their inspections will be audited. The trial will run for 6 months.

Design details

Randomization method
Randomization done in office by a computer.
Randomization unit
The inspector.
Clusters
We expect to have 100 inspectors. This number depends on the municipalities that agree to participate in the study. Some are larger, with 60 inspectors, and others are small, with fewer than 10 inspectors.
Observations
The unit of observation is the inspection. If each inspector conducts 4 inspections per day, there would be 120 visits on average over a 6-week period. Thus, with 100 inspectors we would have 12,000 observations.
Arms
50 inspectors in treatment, 50 inspectors in control arm.
Primary outcomes
Our primary outcomes are discrepancies between the inspector and the auditor: total, and split between number of NA, comply, and does not comply; discrepancy in inspection outcome (pass/fail); duration of the inspection.