Lighting Up Bihar: Electricity Service Delivery as a Collection Action Problem
How to cite
Chaudhary, Sarur; Sudarshan, Anant; Ryan, Nicholas; Burgess, Robin; Greenstone, Michael. 2014. "Lighting Up Bihar: Electricity Service Delivery as a Collection Action Problem." AEA RCT Registry. AEARCTR-0000479. https://doi.org/10.1257/rct.479-1.0
Download: BibTeX · RIS — for reference managers without a browser translator. Zotero and most others pick up this page's citation metadata directly.
* Primary investigator
Abstract
Each poor person cannot buy urban services alone. Many important urban services are utility or network goods, that are only viable to supply at scale, meaning that each customer’s access depends on the take-up and payments of others. This experiment uses a group-level incentive to address this collective action problem in the context of grid electricity, where high theft and other losses limit investment and supply. The hours of power supply to each neighborhood will be explicitly linked to aggregate payment rates from that area so that higher-paying groups can earn more reliable supply. We test how the response to this incentive in terms of collection revenues and power supply varies with neighborhood size and composition.
Intervention
The intervention links the duration of electricity supply to the payment performance of a neighborhood against electricity supplied in the previous month. In this study, consumers are grouped based on the distribution feeder that connects them to the electric grid. Such a feeder typically serves 3,000 consumers. This is the lowest-level at which the distribution companies can control and monitor the hours of supply that is received. It is assumed that consumers that fall under a particular feeder would then act collectively as a group and lead non-payers to improve their payment behavior.
Experimental design
The design of the project is a randomized-controlled trial where the treatment is to link power supply to the neighborhood rate of payment for electricity.
As part of the evaluation, feeders would be randomly assigned to one of the two groups:
1. Treatment: Feeders are supplied electricity according to a set schedule, for urban and rural areas, respectively, and the rate of payment from that feeder in the previous month.
2. Control: Feeders are supplied a standard number of hours of electricity per day at the average number of hours in the schedule for the treatment group.
Design details
Cited by
No citation data available for this registration yet.