Low-Cost Management Consulting and Firm Productivity

How to cite

Mata, Daniel Da; Mation, Lucas. 2018. "Low-Cost Management Consulting and Firm Productivity." AEA RCT Registry. AEARCTR-0003603. https://doi.org/10.1257/rct.3603-2.0

Download: BibTeX · RIS — for reference managers without a browser translator. Zotero and most others pick up this page's citation metadata directly.

Daniel Da Mata* , Lucas Mation

* Primary investigator

Registry ID
AEARCTR-0003603
DOI
https://doi.org/10.1257/rct.3603-2.0
First registered
Last updated
Status
On going
Trial dates
2018-07-23 – 2020-06-30
Countries
Private
Registry record
http://www.socialscienceregistry.org/trials/3603

Abstract

We evaluate the impacts of a low-cost lean manufacturing consulting program aimed at optimizing plant-floor production. The Brazil More Productive is a national-level program that subsidizes consulting services to small and medium firms. We are conducting a randomized phase-in trial to investigate the impacts of this program on productivity. We will also document changes in management practices, owners/managers' perception of their production environment, and reasons for not having adopted these practices before the intervention.

Intervention

This trial investigates the impact of a lean manufacturing consulting intervention on small and medium firms in Brazil. The program, called Brazil More Productive (BmP), offers 120 hours of in-house consulting with a lean manufacturing specialist over a 2-3 months period. After constructing a timed workflow of the production process of the main product of the firm, the specialist suggests series of (low-cost) improvements and aids the firm in implementing those plant-floor improvements. The program costs 18,000 BRL (circa 4,500 USD), of which the firm pays 3,000 BRL and the federal government subsidizes the rest.

Experimental design

We are conducting a phase-in trial with 576 firms from eight states in Brazil. Firms will be randomly allocated into two treatment periods.

Design details

Randomization method
Randomization based on the results of a public lottery. Lottery numbers done in office by a computer.
Randomization unit
Firm
Clusters
576 firms
Observations
576 firms
Arms
288 firms receiving the lean manufacturing consultancy and 288 firms control
Primary outcomes
Total factor productivity (TPF) and labor productivity, Lean Manufacturing maturity index, Persistence of management practices
Secondary outcomes
Production Engineering Outcomes: Lead time, Value added time, Non value added time, Share of value added time, Production potential

Cited by

No citation data available for this registration yet.

Keywords