Abstract
Electrification has long been a benchmark of development, yet almost 70% of the population of Sub-Saharan Africa lives without access to electricity. Since 2006, Kenya’s Rural Electrification Authority (REA) has rapidly expanded the national grid, installing electricity distribution lines and transformers across many of the country’s rural areas. There is now a unique opportunity to increase rural energy access through grid connections. This study explores the opportunity to increase rural energy access through grid connections. We utilize a randomized controlled trial to examine: 1) the demand for grid connections in rural areas, 2) the cost economies associated with mass connections, and 3) the social and economic impacts of grid power.
Intervention
In partnership with the Rural Electrification Authority (REA), our team of researchers will distribute national grid connection subsidies of varying amounts to randomly selected unconnected households in rural parts of Western Kenya. These subsidies will allow households to connect to the national power grid at relatively low prices (compared to the current connection price of $412). There will be three levels of subsidies: (1) high value subsidies equal to $412, (2) mid value subsidies equal to $235, (3) low value subsidies equal to $118.
The randomized encouragement design will allow researchers to generate exogenous variation in electricity connections. In the first stage of the project, the intervention will allow researchers to: (1) trace out the demand curve for electricity connections in order to better understand the price at which the majority of Kenyans would connect to the grid, and (2) trace out the economies of scale in costs resulting from coordinated (grouped) connections. In the second stage of the project, the intervention will allow researchers to measure the social and economic impacts of electrification. The remainder of this text will focus on describing the first stage of this project.
Experimental design
The study will take place across 150 “transformer communities” in Western Kenya. Each transformer community is defined as the group of all households located within 600 meters of a central electricity distribution transformer. In Kenya, all households within 600 meters of a transformer are eligible to apply for an electricity connection. The study will enroll roughly 25 randomly selected households from each transformer community. The subject population will consist of roughly 4,000 unconnected households in total.
The total sample of transformer communities will be randomly divided into treatment and control groups of equal size (75 treatment, 75 control). Each of the 75 treatment communities will be randomly assigned to one of three treatment arms (i.e. subsidy groups). Within each treatment community, all enrolled households will receive the same subsidy offer. After receiving the subsidy offer, treatment households will be given 8 weeks to accept the offer and deliver the required payment to REA. REA will then ensure that an electricity connection is delivered within a reasonable timeframe. Within each treatment community, connection applications will be grouped together, allowing REA to install multiple connections at the same time.
Design details
Cited by