Job Matching for Displaced Contractual Meter Readers under India's Smart Metering Transition: A Randomised Controlled Trial

How to cite

Shaw, Srikant; Sahu, Santosh Kumar. 2026. "Job Matching for Displaced Contractual Meter Readers under India's Smart Metering Transition: A Randomised Controlled Trial." AEA RCT Registry. AEARCTR-0018298. https://doi.org/10.1257/rct.18298-1.1

Download: BibTeX · RIS — for reference managers without a browser translator. Zotero and most others pick up this page's citation metadata directly.

Srikant Shaw* , Santosh Kumar Sahu

* Primary investigator

Registry ID
AEARCTR-0018298
DOI
https://doi.org/10.1257/rct.18298-1.1
First registered
Last updated
Status
In development
Trial dates
2026-08-01 – 2028-05-31
Countries
Private
JEL codes
J63, J65, Q41, O13, L94
Registry record
http://www.socialscienceregistry.org/trials/18298

Abstract

India's Revamped Distribution Sector Scheme (RDSS) is deploying AI-assisted automated metering infrastructure across 42 electricity distribution utilities (DISCOMs) to target 250 million smart meter installations. The tasks automated by these systems, including physical meter reading, manual billing, and field-based fault detection, define the routine occupational core of an estimated three to four million contractual workers in the Indian electricity distribution sector. Unlike permanent DISCOM employees protected by the Industrial Disputes Act 1947, contractual workers have no statutory redundancy protection and are the primary channel through which AI-induced displacement will materialise. This study evaluates whether a structured job-matching intervention can mitigate the employment and earnings costs faced by contractual meter readers in DISCOM distribution circles scheduled for imminent smart meter activation. Contractual workers in treatment circles will receive individualised labour market information, active referral to local employers in adjacent electrical and data-entry occupations, and facilitated registration on India's National Career Service Portal. Workers in control circles receive only the current DISCOM worker communication standard, which provides no active transition support. The primary outcome is employment status at 6 months post-activation. Secondary outcomes include monthly earnings, occupational transition, and subjective well-being at 6 and 18 months. The study is embedded within a complementary quasi-experimental difference-in-differences analysis of RDSS rollout effects on DISCOM employment structure at the utility level, which provides the macro-level displacement estimates that motivate and contextualise the RCT.

Intervention

Contractual meter readers in treatment distribution circles receive a structured job-matching package comprising three components: (1) an individualised labour market information session covering local employer demand, wage benchmarks, and occupational transition options in adjacent electrical and data-oriented roles; (2) active referral to a curated list of local employers in electrical contracting, solar installation, building wiring, and MSME data-entry sectors; and (3) facilitated registration and profile completion on India's National Career Service Portal (NCS Portal, Ministry of Labour and Employment). The intervention is delivered by trained field enumerators approximately 4 to 8 weeks before the worker's circle goes live with smart meter activation. Workers in control circles receive only a general information sheet about government retraining schemes, equivalent to the current DISCOM practice. Each treated worker will receive referrals to at least 3–5 potential employers identified through the baseline employer mapping exercise.

Experimental design

This study uses a cluster-randomised controlled trial in which distribution circles within a single RDSS-participating Indian DISCOM serve as the unit of randomisation. The primary analysis will estimate intention-to-treat (ITT) effects based on assignment to treatment, with treatment-on-the-treated (TOT) effects estimated using take-up as an endogenous variable where applicable.

Design details

Randomization method
Computer-generated random number sequence, stratified by circle size and activation schedule, conducted in the study office prior to any worker contact.
Randomization unit
Distribution circle (cluster). Each DISCOM distribution circle constitutes one cluster. Individual workers within circles are enrolled but not individually randomised; all enrolled workers within a circle receive the same treatment assignment.
Clusters
16 distribution circles (8 treatment, 8 control). Geographically proximate circles will not be assigned to different treatment arms, where feasible, to minimise contamination across clusters.
Observations
320 contractual meter readers (approximately 20 per circle). The sampling frame will be constructed using contractor workforce lists provided by the participating DISCOM or contractor firms.
Arms
8 circles treatment (approximately 160 workers), 8 circles control (approximately 160 workers)
Primary outcomes
Employment status at 6 months post smart meter activation (employed, self-employed, or unemployed), measured by structured phone survey.
Secondary outcomes
1. Monthly earnings at 6 months post-activation 2. Monthly earnings at 18 months post-activation 3. Occupational transition: whether the worker is employed in an adjacent electrical or data-oriented occupation at 6 months 4. Employment status at 18 months post-activation 5. Subjective wellbeing (Cantril Self-Anchoring Scale, 0 to 10) at 6 months

Cited by

No citation data available for this registration yet.

Keywords